Monpolymet LLC were established.
A detailed expedition was carried out in Buduun gold ore mining, located in Selenge province, and the stock was confirmed.
Between 1996-1998, we started using modern mining equipment such as “KOMATSU”
We introduced a complete set of Caterpillar equipment with high capacity to the mining operation.
Environmentally friendly Gold Dredge (ДРАГ 250Д) project has started.
Employee’s residential village has been put into use in Toson plant.
Started exploring the Denj mine in Toson.
The engineer and technical employees unassembled the expired НКМЗ 10/70 walking excavator, then repaired and operated it with thyristor automatic control.
Toson diversion mine began to be mined by the method of Rosdel.
Honored as “THE BEST INVESTOR OF THE YEAR 2001” by the Ministry of Industry and Trade.
10 years anniversary since Monpolymet company were found.
The best tax payer company
Environmentally friendly Gold Dredge (ДРАГ 250Д) project began its operation.
A joint venture with Itochu from Japan established Toson-Gold LLC.
A certificate for the National 100 Business Unit.
A certificate for the Best Inverstor of the year 2003.
“Advanced Natural Nutrition” LLC was found.
An elementary school was built in Dashchilen Soum, Bulgan Province, and handed over to the officials.
Leading Business unit to rehabilitate the environment
“Nar Urt” LLC was established.
The second branch of the environmentally friendly Gold Dredge (ДРАГ 250Д) project began its operation.
A certificate for TOP 100 national Business Unit.
Implementation of “The Green Project” has started for the Technological and Biological to rehabilitation.
The first place among the top Business Units
A certificate for the National TOP 100 Business Unit
Leading Business unit to rehabilitate the environment
The best tax payer company
An expedition began for the Limestone Quarry of Senjit Khudag in Urgun, Dornogovi Province.
The second training of to environmental rehabilitation (National level) was conducted successfully in Toson Quarry.
As part of the Biological rehabilitation work, tree plantations were carried out, such as plantations of 10,000 American bush,6000 Siberian white poplar, and 3000 willow trees in a 79-square kilometer area.
The 9-story of apartment with 96 family resident was selected as the Best Building of the year of Fire Dog (2006-2007).
Top 10 Honorary awards among Mining companies
Highlighted as being Socially responsible company
Leading Business unit to rehabilitate the environment
The best Organization of the Year
A certificate for the ТОP 100 Business Unit
The Limestone quarry stock of Senjit Khudag in Urgun, Dornogovi Province, was approved by the “Ministry of Industrial and Purchase”, and the “Department of Minerals and Petroleum Affairs. “
“Senj-Sant” LLC was established.
Top 10 Honorary awards among Mining companies
Highlighted as being Socially responsible company
Leading Business unit to save and to rehabilitate the environment
The best Organization of the Year
A certificate for the ТОP 100 Business Unit
Introduced the Internet and fiberoptic cable in Urgun Soum, Dornogovi Province.
Laid the foundation for a Cement plant with a capacity of 2500 tons clinker per hour in Urgun, Dornogovi.
The best entrepreneurial company of the year 2009
Bronze Mercury Honorary Award
A certificate for the ТОP 100 Business Unit
The feasibility study of the “Moncement” project was approved by the Ministry of Energy and Mineral Resources of Mongolia.
A Chemical and Physical mineralogical analysis experiment was conducted for the raw materials of dry technology in accordance with the European standard.
According to the Moncement project, the following works were started: A geological, hydrogeological, and geophysics feasibility study; a detailed environmental assessment; the feasibility study of connection to a centralized power source of 110 kV; a 3.5km long railway; and the foundation for the construction of a village and laboratory building with an area of 10,000 m2 have been laid.
Started the implementation of MPM office building, and “Culture, recreation and sports complex”
Top Business unit to rehabilitate the environment
The best Business organization of the year 2010
Introduced the Drip irrigation system for the first time in Mongolia.
Initiated the project “Moncement”
Invited the Mike Roman Consulting Service company from Australia to determine the Limestone stock of Senjit-Khudag according to the International JORC standard. The stock is determined to be 264,000,000 tons.
10 pure-water bore wells were commissioned in Urgun, Dornogovi Province.
Leading environmental rehabilitating Business unit of the year 2011.
A certificate for TOP 150 National Business unit.
“Monpolymet complex” building No. 1 was commissioned.
ECO quarry-2012
Highlighted environmental investor of the year 2012-Ministry of Green Development
Xuaxin Company (subsidiary of Holcim Company from Switzerland, which is at the top of the cement production field) was selected as the contractor for Moncement project and signed on the contract.
Holtek, a company from India, was selected as a consultant and signed the contract.
Leading organization in implementation of HSE
A certificate for TOP 150 National Business unit of the year 2013
Ministry of the Green development of the year 2013– Highlighted environmental investor of the year.
Organized the congress No. IX successfully under the subject of “Mining and Environmental Protection” for a environmental rehabilitation training in cooperating with the “BGR” project by the Professional Inspection Agency and the Federal Republic of Germany for the second time in Toson Mine.
Made a contract with EBRD for the funding of the Moncement project.
Constructed a complete set of temporary towns with 150 residents on the Moncement project site.
The best organization in Mongolian field of mining.
Ministry of Green development in 2014– Highlighted environmental investor of the year
Operated the Moncement plant, which has a capacity of 1,000,000 tons of cement per year.
3.5km long plant railway was handed over to the state committee.
Bulagt 110kv substation was handed over to the state committee.
Moncement project signed a funding contract with the government of Mongolia.
Best ECO quarry
A certificate for national TOP 100 business unit.
TOP 20 group of Forbes Mongolia
Grand expo 2015- The best project of the year
The commissioning of WHR (Generator that generates 5mBt power from heat) in Urgun.
40 European standard hopper wagons of the latest model for bulk cement loading were manufactured in Ukraine and imported to Mongolia.
Monpolymet Group’s 16-story office building was completed and handed over to the state committee.
Completed the construction of two apartment buildings with 44 family residents each in Urgun, Dornogvi Province, and handed them over to the state committee.
One of the TOP 10 companies of the year
The best entrepreneurial company of 2016
Best Entrepreneur Woman Award of 2016
Mongolian Engineers replaced the bandage of Gold Dredge c in Mongolia.
Introduced the bio-coal composter, as an advanced technology and innovation of the environmental habitation, to the mining field for the first time in Mongolia.
Cooperated with Mongolian Honorary agronomist Jamiyan and started planting rare perennials.
The commissioning of the third building of “Monpolymet complex”
The clinker production plant in Ulaanbaatar produced its first cement.
The commissioning of the 110/10 kV sub-station of the clinker production plant in Ulaanbaatar.
Opened a professional “ProFIT fitness center,” which is equipped with modern equipment.
Awarded by EBRD as “a company that supports sustainable development by implementing ecological and social leading practices.”
We started doing high quality of maintenance service for Trommel machine of gold Dredge (Драг) in Toson Mine.
Senjid-Khudag Quarry started doing 100% of the limestone blasting, which is the main raw material for Moncement plant.
After the mining expedition, laboratory test results, and technological experiment at the “Urt taragt” gypsum mine in Delgerkhangai Soum, Dundgovi Province, it was found that the gypsum is grade III, which is suitable for ОРС-42.5, РС-42.5, РС-52.5 types of cement. Therefore, it had been possible to supply shale for the Moncement plant for over 20 years.
GREENPRENEUER: Awarded as “The best Environmental organization” of 2018 for the sixth times by the Ministry of Environment and Tourism
Awarded with “THE BEST ENVIRONMENTAL REHABILITATION ORGANIZATION OF 2018” by the Ministry of Mining and Heavy Industry, and Department of Minerals and Petroleum.
Theoretical and practical training “Professional Mining and environment of 2018”
Began the operation of the “Urd Taragt” gypsum mine in Delgerkhangai Soum, Dundgovi province.
The geological research /БӨМ-2019/ work in the Southern West (The foresty area of Mongolia) has begun.
The blasting drill replacement (СБШ-250) work has begun in Dornogovi Province.
The commissioning of Mandala VIP lounge on the sixth floor of MPM office building.
Selected as a TOP 100 Business unit by the Mongolian Government and the Mongolian National Chamber of Commerce and Industry.
The upper bondage full welding of mountain gold dredge (Драг -2) has been done by our Engineers. Such work was done for the first time Gold Dredge field.
Two types of composters with sizes of 20х26см and 50х50см were introduced as a part of afforestation and biological habitation.
Installation and calibration of the electrical drill (СБШ-250) were completed.
Handed over “Urt taragt” quarry of “Ekhlel Urgash Energy” LLC to the state committee. (located in Delgerkhangai, Dundgovi province)